Cable and containment inspection
A loose termination is a hot one, and heat is measurable. Physical damage to a tray is not, so keep a look but not a monthly one.
- Condition that replaces the interval
- Termination temperature rise above the adjacent connection by 10 C, insulation resistance trend falling, or partial discharge on HV cables
- Reading that proves it
- Termination temperature, insulation resistance, partial discharge
- Why the interval stays
- Terminations and insulation convert; mechanical damage to containment and cable sheaths still needs a walk, at a longer interval.
- Evidence an auditor accepts
- Termination temperature and insulation trend, and the containment walk-down record
- First move
- Torque-mark terminations at the next check so a moved mark is visible without a tool.
What it is evidence for
Clause references from a human-verified corpus licensed to Maintenance Log Converter. A clause marked reference is named, not reproduced.
Calendar tasks a monitored condition could replace ISO 55001:2014 9.1 · ISO 55001:2014 8.1 · ISO 55001:2014 6.2.2 · ISO 55001:2014 8.2 · ISO 55001:2014 10.3 · ISO 45001:2018 8.1.3
ISO 55001:2014 9.1 Monitoring, measurement, analysis and evaluationThe organization determines what needs to be monitored and measured, the methods for monitoring, measurement, analysis and evaluation to ensure valid results, when monitoring and measuring is performed, and when results are analysed and evaluated. It evaluates and reports on asset performance, asset management performa...
ISO 55001:2014 8.1 Operational planning and controlThe organization plans, implements and controls the processes needed to meet requirements and to implement the actions determined in planning, including the actions to address risks and opportunities and the asset management plans. It establishes criteria for the processes, implements control in accordance with the cri...
ISO 55001:2014 6.2.2 Planning to achieve asset management objectivesThe organization integrates the planning to achieve asset management objectives with other organizational planning, including financial, human resources and other support functions. It establishes, documents and maintains asset management plans that define the decision-making method and criteria, the processes and meth...
ISO 55001:2014 8.2 Management of changeRisks associated with any planned change, permanent or temporary, that can have an impact on achieving the asset management objectives are assessed before the change is implemented, and the organization ensures such risks are managed in accordance with 6.1 and 6.2.2. The organization controls planned changes and review...
ISO 55001:2014 10.3 Continual improvementThe organization continually improves the suitability, adequacy and effectiveness of its asset management and its asset management system.
ISO 45001:2018 8.1.3 Management of changeThe organization establishes processes for the implementation and control of planned temporary and permanent changes that impact OH&S performance, including new products, services and processes or changes to existing ones (workplace locations and surroundings, work organization, working conditions, equipment, workforce...
Do this for your whole schedule
Paste your maintenance schedule or log and get this classification for every line at once, with the findings, the overdue items and the clauses the register is evidence for. First 15 items free, no account.
Convert my scheduleLighting inspection and lamp replacement · Emergency stop and safety interlock test