Emergency eyewash and safety shower flush
This is a rare task where the test is the maintenance: the flush clears the line. A sensor turns the tick into a timestamped record, which is what the inspector wants.
What does emergency eyewash and safety shower flush involve?
Emergency eyewash and safety shower flush checks: flow achieved, water clear, duration of flush, temperature in the tepid range. Observed by weekly activation by a nominated person; flow sensor logging where fitted. ANSI Z358.1 (referenced by OSHA) requires weekly activation and an annual inspection; the activation is the maintenance, so a sensor can evidence it but cannot replace it.
- Condition that replaces the interval
- Partly. A flow sensor can log that the weekly activation happened and for how long; the flush itself must still happen because its purpose is to clear stagnant water.
- Reading that proves it
- Flow achieved, water clear, duration of flush, temperature in the tepid range
- Why the interval stays
- ANSI Z358.1 (referenced by OSHA) requires weekly activation and an annual inspection; the activation is the maintenance, so a sensor can evidence it but cannot replace it.
- Evidence an auditor accepts
- Weekly activation log per station with duration and water condition, and the annual inspection record
- First move
- Log the flush by station number with the duration; a 3-second activation is not a flush.
What it is evidence for
Clause references from the published standards text. A clause marked reference is named, not reproduced.
Calendar tasks a monitored condition could replace ISO 55001:2014 9.1 · ISO 55001:2014 8.1 · ISO 55001:2014 6.2.2 · ISO 55001:2014 8.2 · ISO 55001:2014 10.3 · ISO 45001:2018 8.1.3
ISO 55001:2014 9.1 Monitoring, measurement, analysis and evaluationThe organization decides what is to be monitored and measured, which methods of monitoring, measurement, analysis and evaluation will give valid results, when monitoring and measuring take place, and when results are analysed and evaluated. It assesses and reports on how the assets perform, on how asset management perf...
ISO 55001:2014 8.1 Operational planning and controlThe organization plans, carries out and controls the processes needed to satisfy requirements and to deliver three things: the asset management plans set out under 6.2, the actions on risks and opportunities decided under 6.1, and the preventive and corrective actions decided under clauses 10.1 and 10.2. It does so by ...
ISO 55001:2014 6.2.2 Planning to achieve asset management objectivesThe organization joins up its planning for asset management objectives with the rest of its planning, including finance, human resources and other support functions. It sets up, documents and maintains asset management plans that state the method and criteria for making decisions, the processes and methods for managing...
ISO 55001:2014 8.2 Management of changeBefore any planned change is made, whether temporary or permanent, that could affect whether the asset management objectives are met, its risks are assessed, and the organization makes sure those risks are handled as 6.1 and 6.2.2 require. It controls changes it has planned and reviews the consequences of changes that ...
ISO 55001:2014 10.3 Continual improvementThe organization keeps making both its asset management and its system for it more suitable, more adequate and more effective.
ISO 45001:2018 8.1.3 Management of changeThe organization sets up processes to put in place, and keep under control, planned changes, temporary or permanent, that affect OH&S performance. These include: new products, services and processes, or alterations to existing ones (such as where workplaces are and what surrounds them, how work is organized, working co...
Do this for your whole schedule
Paste your maintenance schedule or log and get this classification for every line at once, with the findings, the overdue items and the clauses the register is evidence for. First 15 items free, no account.
Convert my scheduleFirst aid kit contents check · Passenger or goods lift thorough examination