Pressure gauge and indicator check
Where a transmitter sits next to a gauge, the transmitter checks the gauge every second. Compare the two and check the gauges that disagree.
What does a pressure gauge and indicator check involve?
Pressure gauge and indicator check checks: gauge reading against the transmitter or a test gauge; zero on isolation. Observed by comparison against the transmitter in the historian; test gauge at the check. The interval: a monitored condition can replace the fixed interval.
- Condition that replaces the interval
- Gauge reading disagreeing with an adjacent transmitter by more than the gauge class accuracy, or gauge not returning to zero on isolation
- Reading that proves it
- Gauge reading against the transmitter or a test gauge; zero on isolation
- Evidence an auditor accepts
- Gauge check record with the deviation per gauge, and the comparison report from the historian
- First move
- List which gauges have a transmitter alongside; those convert immediately.
What it is evidence for
Clause references from the published standards text. A clause marked reference is named, not reproduced.
Calendar tasks a monitored condition could replace ISO 55001:2014 9.1 · ISO 55001:2014 8.1 · ISO 55001:2014 6.2.2 · ISO 55001:2014 8.2 · ISO 55001:2014 10.3 · ISO 45001:2018 8.1.3
ISO 55001:2014 9.1 Monitoring, measurement, analysis and evaluationThe organization decides what is to be monitored and measured, which methods of monitoring, measurement, analysis and evaluation will give valid results, when monitoring and measuring take place, and when results are analysed and evaluated. It assesses and reports on how the assets perform, on how asset management perf...
ISO 55001:2014 8.1 Operational planning and controlThe organization plans, carries out and controls the processes needed to satisfy requirements and to deliver three things: the asset management plans set out under 6.2, the actions on risks and opportunities decided under 6.1, and the preventive and corrective actions decided under clauses 10.1 and 10.2. It does so by ...
ISO 55001:2014 6.2.2 Planning to achieve asset management objectivesThe organization joins up its planning for asset management objectives with the rest of its planning, including finance, human resources and other support functions. It sets up, documents and maintains asset management plans that state the method and criteria for making decisions, the processes and methods for managing...
ISO 55001:2014 8.2 Management of changeBefore any planned change is made, whether temporary or permanent, that could affect whether the asset management objectives are met, its risks are assessed, and the organization makes sure those risks are handled as 6.1 and 6.2.2 require. It controls changes it has planned and reviews the consequences of changes that ...
ISO 55001:2014 10.3 Continual improvementThe organization keeps making both its asset management and its system for it more suitable, more adequate and more effective.
ISO 45001:2018 8.1.3 Management of changeThe organization sets up processes to put in place, and keep under control, planned changes, temporary or permanent, that affect OH&S performance. These include: new products, services and processes, or alterations to existing ones (such as where workplaces are and what surrounds them, how work is organized, working co...
Do this for your whole schedule
Paste your maintenance schedule or log and get this classification for every line at once, with the findings, the overdue items and the clauses the register is evidence for. First 15 items free, no account.
Convert my scheduleAgitator and mixer inspection · Water softener, RO and treated water check