Refrigerant leak check
The law sets the interval by charge size and gives you a longer one for fitting detection. That is the conversion on offer: fit the detector, halve the visits, keep the log.
What does a refrigerant leak check involve?
Refrigerant leak check checks: refrigerant charge (kg) against nameplate, fixed detector reading (ppm), superheat and subcooling. Observed by fixed leak detector; automatic leak detection system on the circuit; handheld detector at the check. Leak check intervals are set by the EU F-gas Regulation and UK equivalent by charge in CO2 equivalent (every 12, 6 or 3 months, halved again without fixed detection), and by EPA Section 608 in the US.
- Condition that replaces the interval
- Partly. Fixed leak detection in the plant room and an automatic charge monitor on the system detect a leak continuously; the periodic leak check is set by F-gas or refrigerant law by charge size and cannot be dropped, though fixed detection doubles the permitted interval.
- Reading that proves it
- Refrigerant charge (kg) against nameplate, fixed detector reading (ppm), superheat and subcooling
- Why the interval stays
- Leak check intervals are set by the EU F-gas Regulation and UK equivalent by charge in CO2 equivalent (every 12, 6 or 3 months, halved again without fixed detection), and by EPA Section 608 in the US.
- Evidence an auditor accepts
- Leak check record per system in the F-gas log with the charge, method, result and the technician's certification
- First move
- Record the charge in CO2 equivalent on every system so the correct statutory interval is visible on the register.
What it is evidence for
Clause references from the published standards text. A clause marked reference is named, not reproduced.
Statutory intervals that must stay on the calendar ISO 45001:2018 9.1.2 · ISO 45001:2018 6.1.2.1 · ISO 45001:2018 8.1.2 · ISO 45001:2018 8.1.4.2 · ISO 55001:2014 4.2 · ISO 55001:2014 8.1
ISO 45001:2018 9.1.2 Evaluation of complianceThe organization sets up, runs and keeps processes for evaluating whether it complies with legal and other requirements. It decides how often and by what methods compliance is evaluated, carries out the evaluation and acts where needed, keeps up its knowledge and understanding of where it stands on compliance, and reta...
ISO 45001:2018 6.1.2.1 Hazard identificationSet up, run and keep a hazard identification process that is continuous and looks ahead. The process shall take into account: social factors and the way work is organized; activities that are routine and those that are not; incidents that have happened before; possible emergencies; people, including workers, contractor...
ISO 45001:2018 8.1.2 Eliminating hazards and reducing OH&S risksThe organization sets up, runs and keeps processes for removing hazards and lowering OH&S risks by working down the hierarchy of controls: first remove the hazard; next replace it with processes, operations, materials or equipment that are less hazardous; then apply engineering controls and reorganize the work; then ap...
ISO 45001:2018 8.1.4.2 ContractorsThe organization aligns its procurement processes with its contractors so that hazards are identified and the OH&S risks are assessed and controlled where they come from three sources: contractor activities and operations that affect the organization; the organization's own activities and operations that affect contrac...
ISO 55001:2014 4.2 Understanding the needs and expectations of stakeholdersThe organization identifies which stakeholders are relevant to its system for managing assets, and what they require and expect from asset management; it sets the criteria it will use to make asset management decisions; and it identifies what stakeholders require in the way of recorded financial and non-financial infor...
ISO 55001:2014 8.1 Operational planning and controlThe organization plans, carries out and controls the processes needed to satisfy requirements and to deliver three things: the asset management plans set out under 6.2, the actions on risks and opportunities decided under 6.1, and the preventive and corrective actions decided under clauses 10.1 and 10.2. It does so by ...
Do this for your whole schedule
Paste your maintenance schedule or log and get this classification for every line at once, with the findings, the overdue items and the clauses the register is evidence for. First 15 items free, no account.
Convert my scheduleCoil cleaning (condenser and evaporator) · Chiller service and inspection