Cooling tower mechanical inspection
The fan and gearbox are ordinary rotating equipment and convert like any other. The basin clean is a public health task and stays.
What does a cooling tower mechanical inspection involve?
Cooling tower mechanical inspection checks: fan and gearbox vibration, gearbox oil level and condition, wet bulb approach, basin level. Observed by vibration sensor on the fan and gearbox; controller readings for approach and level. The mechanical items convert; the fill and basin clean and disinfection are tied to the legionella regime and stay on its interval.
- Condition that replaces the interval
- Fan vibration above baseline, gearbox oil condition, basin level control cycling, approach temperature above design
- Reading that proves it
- Fan and gearbox vibration, gearbox oil level and condition, wet bulb approach, basin level
- Why the interval stays
- The mechanical items convert; the fill and basin clean and disinfection are tied to the legionella regime and stay on its interval.
- Evidence an auditor accepts
- Vibration and approach trend, and the clean and disinfection record under the water treatment programme
- First move
- Treat the tower as two registers: a mechanical one that converts and a water hygiene one that does not.
What it is evidence for
Clause references from the published standards text. A clause marked reference is named, not reproduced.
Calendar tasks a monitored condition could replace ISO 55001:2014 9.1 · ISO 55001:2014 8.1 · ISO 55001:2014 6.2.2 · ISO 55001:2014 8.2 · ISO 55001:2014 10.3 · ISO 45001:2018 8.1.3
ISO 55001:2014 9.1 Monitoring, measurement, analysis and evaluationThe organization decides what is to be monitored and measured, which methods of monitoring, measurement, analysis and evaluation will give valid results, when monitoring and measuring take place, and when results are analysed and evaluated. It assesses and reports on how the assets perform, on how asset management perf...
ISO 55001:2014 8.1 Operational planning and controlThe organization plans, carries out and controls the processes needed to satisfy requirements and to deliver three things: the asset management plans set out under 6.2, the actions on risks and opportunities decided under 6.1, and the preventive and corrective actions decided under clauses 10.1 and 10.2. It does so by ...
ISO 55001:2014 6.2.2 Planning to achieve asset management objectivesThe organization joins up its planning for asset management objectives with the rest of its planning, including finance, human resources and other support functions. It sets up, documents and maintains asset management plans that state the method and criteria for making decisions, the processes and methods for managing...
ISO 55001:2014 8.2 Management of changeBefore any planned change is made, whether temporary or permanent, that could affect whether the asset management objectives are met, its risks are assessed, and the organization makes sure those risks are handled as 6.1 and 6.2.2 require. It controls changes it has planned and reviews the consequences of changes that ...
ISO 55001:2014 10.3 Continual improvementThe organization keeps making both its asset management and its system for it more suitable, more adequate and more effective.
ISO 45001:2018 8.1.3 Management of changeThe organization sets up processes to put in place, and keep under control, planned changes, temporary or permanent, that affect OH&S performance. These include: new products, services and processes, or alterations to existing ones (such as where workplaces are and what surrounds them, how work is organized, working co...
Do this for your whole schedule
Paste your maintenance schedule or log and get this classification for every line at once, with the findings, the overdue items and the clauses the register is evidence for. First 15 items free, no account.
Convert my scheduleBoiler service and burner tune · Ductwork, damper and fire damper inspection