Cladding and glazing fail slowly and silently until they do not. A drone survey after the storm season and moisture sensors on the elevation that leaked before is the practical conversion.

partly
part of the task converts to a condition and part stays on the calendar
Visual inspection from access equipment or drone; water ingress sensors on known problem elevations
how the condition is observed
Building fabric
asset class
Condition that replaces the interval
None that replaces a periodic look; a post-storm trigger and a fixed maximum interval set by the building regulator for high-rise cladding are the honest answer
Reading that proves it
Fixings secure, sealant condition, glazing gaskets intact, water ingress evidence internally
Why the interval stays
Water ingress converts to internal moisture sensing; the external inspection stays and, for high-rise and combustible cladding, its interval is set by the building safety regulator.
Evidence an auditor accepts
Inspection report per elevation with photographs and the defect and repair record
First move
Photograph each elevation on a fixed grid at every inspection; the comparison is the inspection.

What it is evidence for

Clause references from a human-verified corpus licensed to Maintenance Log Converter. A clause marked reference is named, not reproduced.

Calendar tasks a monitored condition could replace ISO 55001:2014 9.1 · ISO 55001:2014 8.1 · ISO 55001:2014 6.2.2 · ISO 55001:2014 8.2 · ISO 55001:2014 10.3 · ISO 45001:2018 8.1.3
ISO 55001:2014 9.1 Monitoring, measurement, analysis and evaluation

The organization determines what needs to be monitored and measured, the methods for monitoring, measurement, analysis and evaluation to ensure valid results, when monitoring and measuring is performed, and when results are analysed and evaluated. It evaluates and reports on asset performance, asset management performa...

Evidence an auditor accepts: Performance measurement framework covering asset, asset management and system performance; Condition, reliability and cost data with defined collection methods; Periodic performance reports (financial and non-financial)
ISO 55001:2014 8.1 Operational planning and control

The organization plans, implements and controls the processes needed to meet requirements and to implement the actions determined in planning, including the actions to address risks and opportunities and the asset management plans. It establishes criteria for the processes, implements control in accordance with the cri...

Evidence an auditor accepts: Procedures and work instructions for life-cycle activities (acquire, operate, maintain, renew, dispose); Process criteria and performance measures; Work records demonstrating activities carried out as planned
ISO 55001:2014 6.2.2 Planning to achieve asset management objectives

The organization integrates the planning to achieve asset management objectives with other organizational planning, including financial, human resources and other support functions. It establishes, documents and maintains asset management plans that define the decision-making method and criteria, the processes and meth...

Evidence an auditor accepts: Asset management plans per asset class or system with activities, resources, owners and dates; Documented decision-making method and criteria for prioritising activities; Life-cycle cost or whole-of-life models supporting the plans
ISO 55001:2014 8.2 Management of change

Risks associated with any planned change, permanent or temporary, that can have an impact on achieving the asset management objectives are assessed before the change is implemented, and the organization ensures such risks are managed in accordance with 6.1 and 6.2.2. The organization controls planned changes and review...

Evidence an auditor accepts: Change management procedure covering assets, processes, organization and suppliers; Change risk assessments prior to implementation; Post-implementation reviews of unintended consequences
ISO 55001:2014 10.3 Continual improvement

The organization continually improves the suitability, adequacy and effectiveness of its asset management and its asset management system.

Evidence an auditor accepts: Improvement register with sources (audits, reviews, performance analysis, incidents); Evidence of improvements implemented and their measured effect; Trend of performance measures over time
ISO 45001:2018 8.1.3 Management of change

The organization establishes processes for the implementation and control of planned temporary and permanent changes that impact OH&S performance, including new products, services and processes or changes to existing ones (workplace locations and surroundings, work organization, working conditions, equipment, workforce...

Evidence an auditor accepts: Management of change procedure covering all listed change types; Change risk assessments before implementation; Records of unintended changes reviewed and mitigated

Do this for your whole schedule

Paste your maintenance schedule or log and get this classification for every line at once, with the findings, the overdue items and the clauses the register is evidence for. First 15 items free, no account.

Convert my schedule

Automatic door, gate and barrier service · Floor, paving and walkway inspection