Tyre pressure and tread check
A tyre pressure monitor reads every wheel every minute; a weekly gauge check reads it once. Both are the same reading. Keep the driver walkaround because the law does.
- Condition that replaces the interval
- Tyre pressure monitoring reporting a pressure below the placard by 10%, or tread depth from a drive-over reader below the legal limit plus a margin
- Reading that proves it
- Tyre pressure per wheel, tread depth per tyre, wheel nut torque indicator position
- Why the interval stays
- Pressure and tread convert to sensors; wheel nut torque after a wheel change and the daily walkaround stay because the law requires the driver check.
- Evidence an auditor accepts
- Tyre pressure monitoring log and the tread reading per tyre, plus the walkaround defect reports
- First move
- Fit wheel nut indicators on every commercial vehicle; a moved indicator is visible from the walkaround.
What it is evidence for
Clause references from a human-verified corpus licensed to Maintenance Log Converter. A clause marked reference is named, not reproduced.
Calendar tasks a monitored condition could replace ISO 55001:2014 9.1 · ISO 55001:2014 8.1 · ISO 55001:2014 6.2.2 · ISO 55001:2014 8.2 · ISO 55001:2014 10.3 · ISO 45001:2018 8.1.3
ISO 55001:2014 9.1 Monitoring, measurement, analysis and evaluationThe organization determines what needs to be monitored and measured, the methods for monitoring, measurement, analysis and evaluation to ensure valid results, when monitoring and measuring is performed, and when results are analysed and evaluated. It evaluates and reports on asset performance, asset management performa...
ISO 55001:2014 8.1 Operational planning and controlThe organization plans, implements and controls the processes needed to meet requirements and to implement the actions determined in planning, including the actions to address risks and opportunities and the asset management plans. It establishes criteria for the processes, implements control in accordance with the cri...
ISO 55001:2014 6.2.2 Planning to achieve asset management objectivesThe organization integrates the planning to achieve asset management objectives with other organizational planning, including financial, human resources and other support functions. It establishes, documents and maintains asset management plans that define the decision-making method and criteria, the processes and meth...
ISO 55001:2014 8.2 Management of changeRisks associated with any planned change, permanent or temporary, that can have an impact on achieving the asset management objectives are assessed before the change is implemented, and the organization ensures such risks are managed in accordance with 6.1 and 6.2.2. The organization controls planned changes and review...
ISO 55001:2014 10.3 Continual improvementThe organization continually improves the suitability, adequacy and effectiveness of its asset management and its asset management system.
ISO 45001:2018 8.1.3 Management of changeThe organization establishes processes for the implementation and control of planned temporary and permanent changes that impact OH&S performance, including new products, services and processes or changes to existing ones (workplace locations and surroundings, work organization, working conditions, equipment, workforce...
Do this for your whole schedule
Paste your maintenance schedule or log and get this classification for every line at once, with the findings, the overdue items and the clauses the register is evidence for. First 15 items free, no account.
Convert my schedule