Wire rope inspection

A rope is discarded on a count and a diameter, both of which trend. Measure and record them; the trend tells you when the next look is due.

What does a wire rope inspection involve?

Wire rope inspection checks: broken wires per lay length, rope diameter, corrosion and deformation observations. Observed by visual and measured inspection with a rope gauge; magnetic rope testing on large or inaccessible ropes. The discard criteria are measured, so the inspection interval can follow the measured rate of deterioration; the thorough examination of the crane or hoist that carries the rope is statutory and stays.

partly
part of the task converts to a condition and part stays on the calendar
Visual and measured inspection with a rope gauge; magnetic rope testing on large or inaccessible ropes
how the condition is observed
Mechanical
asset class
Condition that replaces the interval
Broken wire count over the reference length, diameter reduction below 90% of nominal, or visible corrosion or core protrusion against the ISO 4309 discard criteria
Reading that proves it
Broken wires per lay length, rope diameter, corrosion and deformation observations
Why the interval stays
The discard criteria are measured, so the inspection interval can follow the measured rate of deterioration; the thorough examination of the crane or hoist that carries the rope is statutory and stays.
Evidence an auditor accepts
Rope inspection record per rope with the broken wire count, diameter and the discard decision
First move
Record the nominal diameter on the rope register and measure at the same three points each time.

What it is evidence for

Clause references from the published standards text. A clause marked reference is named, not reproduced.

Calendar tasks a monitored condition could replace ISO 55001:2014 9.1 · ISO 55001:2014 8.1 · ISO 55001:2014 6.2.2 · ISO 55001:2014 8.2 · ISO 55001:2014 10.3 · ISO 45001:2018 8.1.3
ISO 55001:2014 9.1 Monitoring, measurement, analysis and evaluation

The organization decides what is to be monitored and measured, which methods of monitoring, measurement, analysis and evaluation will give valid results, when monitoring and measuring take place, and when results are analysed and evaluated. It assesses and reports on how the assets perform, on how asset management perf...

Evidence an auditor accepts: Performance measurement framework covering asset, asset management and system performance; Condition, reliability and cost data with defined collection methods; Periodic performance reports (financial and non-financial)
ISO 55001:2014 8.1 Operational planning and control

The organization plans, carries out and controls the processes needed to satisfy requirements and to deliver three things: the asset management plans set out under 6.2, the actions on risks and opportunities decided under 6.1, and the preventive and corrective actions decided under clauses 10.1 and 10.2. It does so by ...

Evidence an auditor accepts: Procedures and work instructions for life-cycle activities (acquire, operate, maintain, renew, dispose); Process criteria and performance measures; Work records demonstrating activities carried out as planned
ISO 55001:2014 6.2.2 Planning to achieve asset management objectives

The organization joins up its planning for asset management objectives with the rest of its planning, including finance, human resources and other support functions. It sets up, documents and maintains asset management plans that state the method and criteria for making decisions, the processes and methods for managing...

Evidence an auditor accepts: Asset management plans per asset class or system with activities, resources, owners and dates; Documented decision-making method and criteria for prioritising activities; Life-cycle cost or whole-of-life models supporting the plans
ISO 55001:2014 8.2 Management of change

Before any planned change is made, whether temporary or permanent, that could affect whether the asset management objectives are met, its risks are assessed, and the organization makes sure those risks are handled as 6.1 and 6.2.2 require. It controls changes it has planned and reviews the consequences of changes that ...

Evidence an auditor accepts: Change management procedure covering assets, processes, organization and suppliers; Change risk assessments prior to implementation; Post-implementation reviews of unintended consequences
ISO 55001:2014 10.3 Continual improvement

The organization keeps making both its asset management and its system for it more suitable, more adequate and more effective.

Evidence an auditor accepts: Improvement register with sources (audits, reviews, performance analysis, incidents); Evidence of improvements implemented and their measured effect; Trend of performance measures over time
ISO 45001:2018 8.1.3 Management of change

The organization sets up processes to put in place, and keep under control, planned changes, temporary or permanent, that affect OH&S performance. These include: new products, services and processes, or alterations to existing ones (such as where workplaces are and what surrounds them, how work is organized, working co...

Evidence an auditor accepts: Management of change procedure covering all listed change types; Change risk assessments before implementation; Records of unintended changes reviewed and mitigated

Do this for your whole schedule