Emergency lighting function and duration test
Self-test fittings are the rare case where the statutory test runs itself. The interval is unchanged; the evidence goes from a clipboard to a panel export.
What does an emergency lighting function and duration test involve?
Emergency lighting function and duration test checks: luminaire lit on mains failure, duration achieved (3 hours or the design duration), battery state. Observed by self-test luminaires reporting to a panel, or a manual key-switch test with a walk-round. Monthly function test and annual full-duration test are set by BS 5266-1, AS 2293.2 and NFPA 101. Self-test fittings automate the test; they do not change its interval.
- Condition that replaces the interval
- Partly. Self-testing luminaires run their own monthly function test and annual duration test and report the result to a central panel; the test still happens on the interval, the person walking round does not.
- Reading that proves it
- Luminaire lit on mains failure, duration achieved (3 hours or the design duration), battery state
- Why the interval stays
- Monthly function test and annual full-duration test are set by BS 5266-1, AS 2293.2 and NFPA 101. Self-test fittings automate the test; they do not change its interval.
- Evidence an auditor accepts
- Test log per luminaire with date, function or duration, result, and the panel report where self-test is fitted
- First move
- If the fittings are self-testing, export the panel log monthly and file it as the test record; if not, the walk-round stays.
What it is evidence for
Clause references from the published standards text. A clause marked reference is named, not reproduced.
Statutory intervals that must stay on the calendar ISO 45001:2018 9.1.2 · ISO 45001:2018 6.1.2.1 · ISO 45001:2018 8.1.2 · ISO 45001:2018 8.1.4.2 · ISO 55001:2014 4.2 · ISO 55001:2014 8.1
ISO 45001:2018 9.1.2 Evaluation of complianceThe organization sets up, runs and keeps processes for evaluating whether it complies with legal and other requirements. It decides how often and by what methods compliance is evaluated, carries out the evaluation and acts where needed, keeps up its knowledge and understanding of where it stands on compliance, and reta...
ISO 45001:2018 6.1.2.1 Hazard identificationSet up, run and keep a hazard identification process that is continuous and looks ahead. The process shall take into account: social factors and the way work is organized; activities that are routine and those that are not; incidents that have happened before; possible emergencies; people, including workers, contractor...
ISO 45001:2018 8.1.2 Eliminating hazards and reducing OH&S risksThe organization sets up, runs and keeps processes for removing hazards and lowering OH&S risks by working down the hierarchy of controls: first remove the hazard; next replace it with processes, operations, materials or equipment that are less hazardous; then apply engineering controls and reorganize the work; then ap...
ISO 45001:2018 8.1.4.2 ContractorsThe organization aligns its procurement processes with its contractors so that hazards are identified and the OH&S risks are assessed and controlled where they come from three sources: contractor activities and operations that affect the organization; the organization's own activities and operations that affect contrac...
ISO 55001:2014 4.2 Understanding the needs and expectations of stakeholdersThe organization identifies which stakeholders are relevant to its system for managing assets, and what they require and expect from asset management; it sets the criteria it will use to make asset management decisions; and it identifies what stakeholders require in the way of recorded financial and non-financial infor...
ISO 55001:2014 8.1 Operational planning and controlThe organization plans, carries out and controls the processes needed to satisfy requirements and to deliver three things: the asset management plans set out under 6.2, the actions on risks and opportunities decided under 6.1, and the preventive and corrective actions decided under clauses 10.1 and 10.2. It does so by ...
Do this for your whole schedule
Paste your maintenance schedule or log and get this classification for every line at once, with the findings, the overdue items and the clauses the register is evidence for. First 15 items free, no account.
Convert my scheduleSprinkler system flow, alarm and valve test · Fire door inspection