Sprinkler system flow, alarm and valve test
A monitored sprinkler system still has to prove that water moves and the alarm reaches the monitoring station. The supervision signals are evidence of the days between; the flow test is the evidence the code wants.
What does a sprinkler system flow, alarm and valve test involve?
Sprinkler system flow, alarm and valve test checks: static and residual pressure at the test point, alarm received within the required time, valve tamper switches normal, tank level. Observed by weekly or monthly flow test by a nominated person; annual inspection by a sprinkler contractor. Test frequencies are set by BS EN 12845, AS 1851 and NFPA 25. Pressure and valve-position monitoring supplement the tests and cannot stand in for the flow test.
- Condition that replaces the interval
- None that replaces the interval. Continuous supervision of tank level, system pressure and valve position closes the gap between tests.
- Reading that proves it
- Static and residual pressure at the test point, alarm received within the required time, valve tamper switches normal, tank level
- Why the interval stays
- Test frequencies are set by BS EN 12845, AS 1851 and NFPA 25. Pressure and valve-position monitoring supplement the tests and cannot stand in for the flow test.
- Evidence an auditor accepts
- Weekly test sheet with pressures and alarm response, valve status record, and the annual contractor inspection report
- First move
- Put the pressure readings on the weekly sheet, not just a tick. A falling static pressure trend is the early warning.
What it is evidence for
Clause references from the published standards text. A clause marked reference is named, not reproduced.
Statutory intervals that must stay on the calendar ISO 45001:2018 9.1.2 · ISO 45001:2018 6.1.2.1 · ISO 45001:2018 8.1.2 · ISO 45001:2018 8.1.4.2 · ISO 55001:2014 4.2 · ISO 55001:2014 8.1
ISO 45001:2018 9.1.2 Evaluation of complianceThe organization sets up, runs and keeps processes for evaluating whether it complies with legal and other requirements. It decides how often and by what methods compliance is evaluated, carries out the evaluation and acts where needed, keeps up its knowledge and understanding of where it stands on compliance, and reta...
ISO 45001:2018 6.1.2.1 Hazard identificationSet up, run and keep a hazard identification process that is continuous and looks ahead. The process shall take into account: social factors and the way work is organized; activities that are routine and those that are not; incidents that have happened before; possible emergencies; people, including workers, contractor...
ISO 45001:2018 8.1.2 Eliminating hazards and reducing OH&S risksThe organization sets up, runs and keeps processes for removing hazards and lowering OH&S risks by working down the hierarchy of controls: first remove the hazard; next replace it with processes, operations, materials or equipment that are less hazardous; then apply engineering controls and reorganize the work; then ap...
ISO 45001:2018 8.1.4.2 ContractorsThe organization aligns its procurement processes with its contractors so that hazards are identified and the OH&S risks are assessed and controlled where they come from three sources: contractor activities and operations that affect the organization; the organization's own activities and operations that affect contrac...
ISO 55001:2014 4.2 Understanding the needs and expectations of stakeholdersThe organization identifies which stakeholders are relevant to its system for managing assets, and what they require and expect from asset management; it sets the criteria it will use to make asset management decisions; and it identifies what stakeholders require in the way of recorded financial and non-financial infor...
ISO 55001:2014 8.1 Operational planning and controlThe organization plans, carries out and controls the processes needed to satisfy requirements and to deliver three things: the asset management plans set out under 6.2, the actions on risks and opportunities decided under 6.1, and the preventive and corrective actions decided under clauses 10.1 and 10.2. It does so by ...
Do this for your whole schedule
Paste your maintenance schedule or log and get this classification for every line at once, with the findings, the overdue items and the clauses the register is evidence for. First 15 items free, no account.
Convert my scheduleFire alarm weekly test and periodic service · Emergency lighting function and duration test